Case Studies

Case Study _RCPro _Oil Gas _FINAL_2016

Global Oil and Gas Producer

How a global oil and gas producer uses RC Pro™ to uncover and solve hidden issues in its Root Cause Analysis program

Read Case Study


Case Study _Coal Terminal

Coal Terminal

ARMS Reliability helped a coal terminal to determine the optimum number of spare to hold onsite.   

Read Case Study


Case Study _RCA_Major Food Company _FINAL_2016

Food Manufacturer

How a major food company makes the most of the Apollo Root Cause Analysis methodology.  

Read Case Study


Case Study _Welding Machine

Welding Machine

Maintenance strategy optimization yields significant annual savings for manufacturer of heavy machinery on an automated welding machine. 

Read Case Study


Next -Gen Power Company

Next-Gen Power Company

Power company brought in ARMS Reliability to conduct a Reliability Centred Maintenance (RCM) study - to plot the best maintenance path for the turbines into the future.

Read Case Study


Case Study _Beverage Company Bottle Filler _FINAL

Beverage Manufacturer

ARMS Reliability was engaged to perform a Reliability Centered Maintenance (RCM) study on a bottle filling machine. The resulting optimized maintenance strategies reduced costs by 19%.

Read Case Study


Case Study _Iron Ore Mine _FINAL

Iron Ore Mine

An iron ore mine located in Western Australia's Pilbara region recognized that there was significant room for improvement within its work management master data and maintenance strategies. 

Read Case Study


Case Study _Confectionary Company _FINAL

Confectionery Company

A processing plant was experiencing problems, causing output to fall and maintenance costs to rise. To fix the ongoing interruptions and subsequent losses, the company engaged ARMS Reliability to perform a Reliability Centered Maintenance (RCM) study. 

Read Case Study


barrick-case-study

Barrick Gold

Using Reliability Centered Maintenance, ARMS Reliability Help Barrick Gold Develop Robust Justifiable Maintenance Strategies For The Pueblo Viejo Mine Development In The Dominican Republic

Read Case Study


Avista -case -study

Avista Utilities

Little Falls Hydro Electric Development was completed and put into operations by Avista Utilities in 1910. It has a generating capacity of 35.6 MVA using four 8.9 MVA generators with double horizontal Francis turbines.

Read Case Study


Callahousi -copper -mine

Collahuasi Copper

Collahuasi is one of Chile's four largest copper producers. Two Bucyrus 495HR and five 495B1 shovels are workhorses at the Collahuasi mine. Collahuasi's seven pieces of equipment must remain in good working order for the site to fulfill its output goals.

Read Case Study


Peabody -case -study

Peabody Energy

ARMS Reliability Helps Peabody Energy Avoid Unnecessary, Costly Equipment Replacement and Optimize Maintenance Plans

Read Case Study


Fonterra -case -study

Fonterra

International Dairy Leader Achieves Bottom-Line Results by Institutionalizing Root Cause Analysis

Read Case Study


Tropicana -case -study

AngloGold Ashanti

By getting in early with the maintenance strategies - that is, before production kicked off - AngloGold Ashanti has avoided huge potential delays and costs down the track.

Read Case Study

     

Case Study Archive


Power Utilities

Water