Starting From Scratch With Spares

As anyone with a hand in running a household knows, it’s important to keep a stockpile of key items. You certainly don’t want to find out the hard way that you’re on your last square of toilet paper. But in the case of a facility like a power plant, a missing spare part could be more than just a nuisance—it could be downright expensive.

Determining the appropriate spare parts to have on hand in a large facility, however, can be tricky. This is especially true after building a facility from the ground up, when you don’t have a frame of reference for which spare parts you’re most likely to need first.

Most organizations deal with this in one of two ways: 1) they guess or 2) they purchase according to a spares list provided by an equipment vendor.

A Reliability-Focused Purchase List

There are obvious limitations when it comes to guesswork—making the wrong guess can result in huge expenses either in unnecessary spare parts or in costly downtime. A vendor-suggested list is probably somewhat more accurate, but such suggestions are unlikely to take into account the specific needs of your organization. We approach spare part holding recommendations through the lens of reliability as it applies to each specific operation. As factors change, it’s important to re-evaluate, making sure to take into account everything that could influence purchase priorities.

Recently, a utility company approached us to review the list of spare parts their equipment vendor had recommended. According to the vendor, this utility needed to purchase $4.9 million worth of spare parts up front. The utility wanted a second opinion before making such a sizable investment.

Our Approach

We started the spare parts analysis by looking at the list provided by the equipment vendor, but then we dug much deeper. We explored a series of questions, including: How often is this part likely to fail? What is the cost of the downtime if the part is attached to a critical piece of equipment? What is the unit cost of the spare part? What is the lead time to obtain a spare? Is this part likely to fail at any time throughout its lifecycle, or is it only likely to fail at the end of its life? There is no point in purchasing a spare today if you are unlikely to need it for another 20 years.

In all, about 1,500 pieces of equipment were reviewed over 40 days before providing a recommended list of spares. The final list included some of what the vendor had recommended, left off many of the vendor’s recommended parts, and suggested a few additional parts that weren’t in the original list.

The final critical spares list that was recommended included a total of $2.2 million in spare parts—a savings of $2.7 million over what the vendor had originally recommended.

Built to Adapt

Our recommended spares list is intended to be responsive to changing needs and new information. When the utility took a second look at its downtime cost and calculated that it was actually $10/megawatt and not the $23/megawatt they had initially determined, we re-evaluated the spares list, reducing the utility’s recommended purchases by another $200,000.

Conclusion

If your organization is like most, you probably run into trouble when it comes to having the right spares on hand. Either you’re missing the right parts when something breaks down, or you have expensive spares gathering dust and potentially going bad in storage. ARMS Reliability takes the guesswork out of developing a critical spares list, taking into account item costs, the likelihood of failure, lead times, downtime costs, and all other relevant factors.

The investment this utility made to conduct the analysis with our help ultimately reduced their bottom line equipment costs by $2.7 million—which represented a savings of 50 to 1. Beyond the monetary benefit, the utility’s Reliability Engineer felt much more confident in the approach taken. He was also relieved to avoid grossly overspending on spares.

Questions? We'll put you on the right path.

Talk to us about how we can help you with a Spare Parts Analysis. We're ready to help.